Updated 09/03/2025
In force

Version from: 01/01/2025
Amendments (1)
There is currently no Level 2 legal act based on or specifying Article 495g.
Search within this legal act

Article 495g - Regulation 575/2013 (CRR)

Article 495g

Transitional arrangements for certain public guarantees schemes

By way of derogation from Articles 183(1) and 213(1), a guarantee that can be cancelled in the event of fraud by the obligor or the extent of credit protection of which can be diminished in such event, shall be considered to meet the requirements referred to in Article 183(1), point (d), and in Article 213(1), point (c), where the guarantee was provided by an entity referred to in Article 214(2), point (a), no later than 31 December 2024.